Track record

  • 2020: 1,1 km Fibre Optical Cable repair, Pull-inn, trenching and fixation on rock, Macae, ZemaxLog / Petrobras
  • 2019: 4 cable repairs for ZemaxLog, Rio de Janeiro, Embratel / Claro
  • 2019: 1.2 km Fibre Optical Cable repair, pull-inn , and trenching, Macae, Padtec / Petrobras
  • 2019: Fibre Optical Cable repair, pipeline crossing, trenching and cover with 90 m3 of concrete in fabric formworks 47msw, Santos, Padtec / Google
  • 2018: 500m Fibre Optical Cable repair and trenching, 47msw, Santos, Padtec / Google
  • 2018: 1,2 km Fibre Optical Cable repair, pull-inn and trenching, Macae, Padtec / Petrobras
  • 2017: 6 km Fibre Optical Cable landing and trenching, Santos, PadTec / Google
  • 2017: 1,5 km Fibre Optical Cable landing and trenching, Rio de Janeiro, PadTec / Google
  • 2016: 3 km Electrical Cable, Rio de Janeiro, Brazilian Navy
  • 2016: 5 km Elecrical/optical Cable, Angra dos Reis, Ampla
  • 2014: 1,5 + 1 km Fibre optical cable repair and trenching, Macae, Shahin
  • 2013: 2km Fibre optic cable, Salvador, LigGlobal
  • 2013: 2x 3km Electrical Cable, Salvador, Prysmian
  • 2013: 1,5 km Fibre Optic Cable landing and trenching, Salvador, Alcatel
  • 2013: 1,5 km Fibre Optic cable landing and trenching, Rio de janeiro, Alcatel
  • 2011-2012: 34 km Fibre optic cable, Barra do Furado, Shahin / Petrobras

This email address is being protected from spambots. You need JavaScript enabled to view it.

+55 21 3795-9234

Trident Oceans Gestao de Projetos LTDA

Rua Francisco Eugênio 268 – sala 405
São Cristovão, Rio de Janeiro
CEP.: 20941-120

CNPJ:16.662286/0001-00